Questions? Give us a call! 1-844-833-4041

Joseph A Perry, PE, CFLC

Electrical Contracting, Electrical Engineering, Electricity Building Codes, Construction, Construction Damages, Construction Site, Control Systems, Electrical, Electrical Accidents, Electrical Codes, Electrical Defects, Electrical Engineering, Electrical Fire Cause and Origin, Electrocution, Equipment and Machinery, Fire, Forensic Engineering Electric, Generators, High Voltage, Industrial Design, Personal Injury Electrical, Scheduling Delay and Analysis, Shock, Shocks, Solar Energy, Standard of Care […]

Read More…

John E Poole, P.E.

Civil Engineering, Construction Cost, Construction Defects, Construction Failures, Construction Injuries, Construction Schedule Delays, Structural Failures, Water Intrusion Americans With Disabilities Act (ADA), Building Codes, Civil Engineering, Construction, Construction Defects, Construction Schedule Delays, OSHA Ramp & Stairs, Scheduling Delay and Analysis, Storm Water, Structural Engineering, Stucco, Water Intrusion, Waterproofing Pennsylvania […]

Read More…

William C. Stein, Jr., PE, CCM

ADA Compliance, Construction Management, Construction Materials, Roadway & Bridge Construction, ROW Issues, Temp, Traffic Control Asphalt, Building Contractor Liability, Civil Engineering, Coatings, Concrete/Cement, Construction, Construction Damages, Construction Management, Construction Site, Construction Traffic Control, Contract Documents, CPM Scheduling (Primavera), Designs, Earthwork, Expert Reports, Forensic Investigations, Highway, Materials, Materials Engineering, Other Construction Materials, Paint and Coatings, Plans, […]

Read More…

Sanford “Sandy” Loy, CCM BArch MSCE

Construction, Contracts and Administration Building Codes, Building Compliance, Building Construction, Building Exteriors / Envelopes, Building Materials / Products, Building Technology, Civil Engineering, Commercial Construction, Concrete & Concrete Construction, Concrete Foundations, Construction, Construction Accidents, Construction Claims, Construction Cost Estimates / Analysis, Construction Cost of Repairs, Construction Defect Resolution, Construction Defects, Construction Defects (Project Management), Construction Delays, […]

Read More…

Ted S Merrill

Construction, Construction Damages Accident Reconstruction (Construction), Building Repairs, Cabinets, Carpentry, Construction, Construction Contracting, Construction Damages, Construction Defects, Construction Disputes, Construction Estimates, Decay and Defects, Decks, Finish Carpentry, Floors & Flooring, Foundation Movement, Foundation Repair, Framing, House Repairs, Installation, Molding/Paneling, Residential, Restoration (Fire Water and Mold), Scheduling Delay and Analysis, Stair and Stairways California […]

Read More…

Robert Secrest, P.E, CCE, PMP, LEED A.P., LSSBB, QSD, CPSWQ, EP2, CQM, HAZWOPER, MIAM, COR, RE Broker, Mortgage Broker, Class B+ Skipper, FAA Pilot, MBA

ADA, Building Codes, Civil Engineering, Pipelines, Stormwater Americans With Disabilities Act (ADA), Backups, Civil Engineering, Construction Damages, Construction Site, Drainage, Erosion and Sediment Control, Flooding, Floodplain Mapping, Groundwater, Groundwater Pollution, Hydrology, Marine Engineering, Pipe Failure Analysis, Pipeline Explosions, Pipeline Failure, Pipeline Weld Failures, Pipelines, Real Estate Broker, Runoff, Scheduling Delay and Analysis, Septic Systems, Sewers, […]

Read More…